關于年產60萬噸硫磺制(zhi)酸項(xiang)目安裝工程施工(gong)的補遺(yi)通知
各潛在投標人(ren):
現將年產60萬噸硫磺制酸項目(mu)安裝(zhuang)工程施工招標文件內容作出如下(xia)變更:
1、招標(biao)文件第四章合(he)(he)同條(tiao)款及格式(shi)第三部分(fen)專用合(he)(he)同條(tiao)款第14.2條中?“發包(bao)人完(wan)成(cheng)竣(jun)工(gong)付(fu)款的期(qi)限:工(gong)程竣(jun)工(gong)驗(yan)收合格,承包(bao)人遞交竣(jun)工(gong)結(jie)算,完(wan)成(cheng)所有簽字完(wan)善(shan)的工(gong)程竣(jun)工(gong)資料(包(bao)含竣(jun)工(gong)圖、隱蔽資料、質檢資料、工(gong)程變(bian)更和經濟簽證資料等)原件(jian)和掃(sao)描件(jian)電子版移交且竣(jun)工(gong)結(jie)算審核后(hou),發包人五年內(nei)支付至結算審(shen)核金(jin)額的97%,剩余3%作為質(zhi)保(bao)金兩年內支(zhi)付(fu)(質(zhi)保(bao)金支(zhi)付(fu)及質(zhi)保(bao)期按附(fu)件《工程(cheng)質(zhi)量保(bao)修(xiu)書》規定(ding)執行)。”,變(bian)更(geng)為“發(fa)包(bao)(bao)人完(wan)成(cheng)竣(jun)工(gong)付款的期(qi)限:工(gong)程(cheng)竣(jun)工(gong)驗(yan)收(shou)合格,承包(bao)(bao)人遞交(jiao)竣(jun)工(gong)結算,完(wan)成(cheng)所有簽字完(wan)善的工(gong)程(cheng)竣(jun)工(gong)資(zi)料(包(bao)(bao)含竣(jun)工(gong)圖、隱(yin)蔽資(zi)料、質檢資(zi)料、工(gong)程(cheng)變更(geng)和(he)經濟簽證(zheng)資(zi)料等)原件和(he)掃(sao)描件電子版移交(jiao)且竣(jun)工(gong)結算審核后,發包人兩年內支付至(zhi)結算審(shen)核(he)金額的97%,剩(sheng)余3%作為質保(bao)金兩年內支付(質保(bao)金支付及質保(bao)期(qi)按附(fu)件《工程(cheng)質量(liang)保(bao)修書》規定(ding)執行)。”。
2、其余內(nei)容不變。
******有限公司
2025年11月18日
首頁